Advice on geotechnical design of two lagoons, including liner

British Sugar Plc. is building a biogas facility to produce 100,000m³ of gas per day. This will provide energy for the factory, which is the largest sugar beet factory inEurope.

Services provided included:

• Advice on the location, conceptual and detailed design for 2 lagoons for the project requiring 150,000m3 for biogas and 50,000m3 for water storage.

• Designed and supervised the installation of ground water monitoring equipment

• Conducted regular groundwater monitoring

Project start: 01 December 2009

Project completion: 31 January 2013

Sector
Water Resources  Infrastructure  

Location
Wissington, Norfolk, UK