Pipeline Route Selection | CARES Group
Global expertise local presence
Pipeline Route Selection
Geophysical & Geotechnical Investigation

Mobil Producing Nigeria (MPN) has considered replacing the existing Yoho YP to Floating Storage and Offloading (FSO) pipeline.

To inform this consideration, CARES was engaged by DeltaAfrik / MPN to carry out geophysical and geotechnical surveys along the pipeline route.

These surveys were conducted to determine the soil parameters for the pipeline route selection. A Multibeam Echo Sounder (MBES) was deployed for bathymetry and sea floor mapping.

CARES determined the soil parameters for the pipeline route selection and the results are due to be analysed and used during the detailed design phase.

Project start: 01 November 2015 - Ongoing

Sector
Oil & Gas  

Location
Akwa Ibom, Nigeria

Services

Services Provided Included:

  • Geophysical survey
  • Geotechnical survey
  • Primary soil characteristics
  • Sea floor mapping
  • Bathymetry