Nigeria Hydropower
Project Summary

A number of dams have been constructed by the Department of Agriculture in Nigeria. These were formerly irrigation projects but a number have a hydropower generating capacity installed.

The project aim was to review these schemes to assess whether they could be brought into production or if the present capacity could be increased.

Project start: 01 March 2007

Project completion: 01 June 2007

Sector
Infrastructure  Water Resources  

Location
Various within Nigeria

Services

Services provided included:

  • Review of existing projects
  • Site inspections
  • Review of design
  • Assessment of hydro capability
  • Assessment of potential hydro capacity