Apapa Terminal: Structural Stability study | CARES Group
Global expertise local presence
Apapa Terminal: Structural Stability study
  • Hydrography image
  • an oil jetty
Project Summary

NIPCO PLC wished to deepen one of the oil jetties at Apapa Petroleum Terminal in order for fully loaded 30,000 DWT tankers to be able to use the jetty.

Project start: 02 June 2013

Project completion: 12 June 2013

Sector
Infrastructure  Maritime  

Location
Lagos, Nigeria

Services

Services provided included:

  • Geotechnical site investigation and hydrographic survey
  • Condition survey of existing jetties and structural assessment
  • Options for deepening the jetties, including rebuilding or extension to the existing structures
  • Stability of slopes after dredging, and stability of nearby quay wall